Why Assess Before You Buy
Ordering mid-range miners rated at 0.05 TH/s or higher without understanding your site’s electrical and thermal limits leads to breaker trips, throttled hash rates, and expensive retrofits. Our site assessment gives you a written foundation for hardware decisions.
What We Measure On-Site
- Electrical capacity — panel inventory, available amperage, phase balance, and distance to proposed rack locations.
- Thermal baseline — inlet and ambient temperature readings at multiple points over a four-hour window.
- Physical layout — floor load, ceiling height, door clearances for equipment delivery, and cable-run distances.
- Environmental factors — humidity, dust exposure, salt-air proximity, and existing ventilation paths.
- Regulatory context — zoning classification and noise considerations for your municipality (advisory only).
Assessment Deliverables
Within five business days of the visit you receive:
- Maximum recommended unit count at your target efficiency rating
- Cooling upgrade recommendations with estimated cost ranges
- Rack or shelf layout sketch scaled to your floor plan
- Electrical upgrade scope if your current service is insufficient
- Priority-ranked action list before purchase order signing
Who Should Book
- First-time operators converting agricultural or warehouse space
- Existing yards planning expansion beyond current breaker capacity
- Container-yard owners seeing seasonal hash-rate drops above 10%
- Buyers evaluating used hardware batches who need independent power verification
Scheduling & Fees
Standard assessments within 200 km of Busan: KRW 650,000 fixed fee. Extended multi-building visits: KRW 1,100,000. Remote sites beyond 200 km quoted with travel at cost.